30 Oct ’14 - 7:26 am
sp_Permalink sp_Print

seems yukon is still having some issues logging in, Icanreachit, take a look at how we built our barn roof, you do not have to run the overhang over the gable to the first rafter, you can just toe nail short pieces into your fascia board, even with our snow load here it is not an issue

http://thehomesteadi.....ct/page-5/

the same on our house

Avatar
icanreachit
Farm Hand
Members
Forum Posts: 562
Member Since:
27 Aug ’14
sp_UserOfflineSmall Offline
34
30 Oct ’14 - 3:27 pm
sp_Permalink sp_Print sp_EditHistory

Perfect. I couldn't find any framing rules on when you needed them or when not but the rafters on the other sides of the house were never supported and are not starting to sag a bit.

For anyone that is interested, here is a very in detail breakdown on pricing, for those less interested, I am looking at $5767 in materials and then $2070 in permits and engineering stamps (I need to get a stamp of my own...) for a grand total of $7836.67. Sadly this is still $104/sf. This is 100% DIY so no expenses for labor and almost everything is purchased new.

Anyone interested in the PDF left me know, haven't found a good way to upload it safely.

Item Name Material %
Footing 198.63 2%
Excavation 20" x13" deep    
4" Insulating Blueboard - Below    
1/2" Rebar - 3" in, 3" up - 60' total 22.41  
1/2" Rebar - Into existing slab, 2' legs, 1 per footer, every 24" in slab = 12 or 24' 7.47  
16" w x 9" D Channel - Cement - .9 cubic yards 168.75  
#4 Rebar dowels up for stem wall support - every 24", enough to tie into slab    
Plumbing Rough-in and Connection 200 2%
Tubing 200.00  
3" Diameter    
2" Diameter    
Connections    
3" Y to 2", etc    
Stem Wall and Slab 675.86 8%
Cement blocks - 3 courses - Stem Wall, 19 8x8x16 1 8x8x8 47.50  
Bond Beam Blocks - 1 course 28.50  
Surface Bond Cement - 1/4" coverage 34.78  
R11 - Bora Foam - Wrap stem walls 4x8 150.00  
Stucco Mesh - 38" x 150' 39.99  
Coating - 5 gallon = 80sf, 42sf Exposed 79.99  
6 mil PE - 10x25 25.00  
Anchor bolts - 10" (6" below, 2.5" above) w/in 12" of end, less than 6' spacing 10.44  
Rebar - slab to stem wall - #4 12" OC, 12" leg in each part (2' each) - 25 total = 50' 22.41  
Rebar sheets - double overlap min overlap - 6"x6" 4mm - 42"x86" 43.50  
Rebar Chair 25.00  
Slab - 4" Thick - 1 cubic yard 168.75  
Rough Carpentry 825.23 10%
Wood - Southern Pine or Douglas Fir    
Wall    
North    
2x4x10 PT - Sill Plate 5.37  
2x4x10 - Top Plates 8.10  
2x4x8 - Wall Studs 33.55  
4x4x8 - Header (34" Needed) 7.77  
Connectors 8.12  
East    
2x4x10 PT - Sill Plate 5.37  
2x4x10 - Top Plates 16.20  
2x4x8 - Wall Studs 27.45  
4x4x8 - Header (34" Needed) 31.08  
Connectors 8.12  
South    
2x4x10 PT - Sill Plate 5.37  
2x4x10 - Top Plates 8.10  
2x4x8 - Wall Studs 30.50  
4x4x8 - Header (34" Needed) 7.77  
Connectors 5.80  
15/32" Ply 168.96  
Interior    
2x4x10 PT - Sill Plate 5.37  
2x4x10 - Wall Studs 16.20  
2x4x8 - Wall Studs 12.20  
Connectors 1.74  
Roof    
2x10x16 - Ridge Beam - PT 22.97  
Connectors - Beam to Rafter 28.26  
Connectors - Rafter to Top Plate 10.44  
2x8x8 - Rafters - PT 100.44  
2x8x6 - Jack Rafters - PT 33.48  
2x6x8 - Gable Rafters - PT 11.14  
2x6x8 - Fascia Boards - PT 11.14  
2x4x10' - Lookouts - PT 21.48  
2x6x10' - Roof Connection - PT 30.28  
5/8" Ply or 7/16" OSB - 110 MPH resistant (ASTM d3161) - $12.27 84.48  
10 Penny common or 8 penny ring shank, every 4" on edge, every 6" in center 50.00  
Nashua 1.89x180' Silver Duct Tape - Seams 7.98  
Exterior Finish 526.71 7%
Wood siding    
East wall - Recycle from house cut out    
N&S wall - $21.98 per 10.9sf (n-62.5sf, s-62sf, e-67.5) 263.76  
Tyvex Home Wrap 3 x 165' 52.95  
Nailing Pattern: 1x8 or less - 2 x 8D x stud 0.00  
Exterior Foam Board Insulation 2.5" - 192.5sf 210.00  
Exterior Trim 50 1%
Misc. Trim 50.00  
Doors 413 5%
Pocket door - Frame 109.00  
30" x 72" x 1 129.00  
Shower Door 175.00  
2x extra glass panes    
Windows 934.59 12%
Windows    
57"x12" - 63x17.5 108.00  
30"x12" - 32x14 or 32x16 103.21  
Trapazoids 713.38  
Pentagon 0.00  
Window Cap 10.00  
Fasteners - 12" OC    
4d box or common nails, or 16g staple w/ 1.5" legs & 7/16" crown, Galv o AL, AL w/ AL Frame    
Finish Hardware 25.00 0%
Door sills 25.00  
Roofing, Flashing, Fascia 218.25 3%
Tar Paper - 30# - 216 sf/roll 15.25  
Drip Edge (under felt on edge, over felt on gable) - 10' strips 18.00  
Roofing Material - Class 1-4 (4 is best) Composition Shingles - 33sf per bundle 115.00  
Metal Roofing =D93*C93  
Roof coating =D94*C94  
Gutters 20.00  
Nails 50.00  
Wiring 84.37 1%
Installing a new breaker    
Wiring - 50' 12/2 60.34  
Circuit Breaker - 20 amp? 7.00  
GFCI Outlets 12.48  
Toggle switch - 15amp 2.07  
Toggle switch cover - 3-gang 2.48  
Receptacles - one for switches, one for strip lights, one for recessed light above shower    
3-gang 2.30  
Single 5.68  
Insulation - In wall/roof 118.72 3%
Wall - R16 - 1.5 bags - 192.5sf 29.68  
Roof - R30 - 2.5 bags - 162 sf 89.04  
Interior Wall Finish 269.8 3%
Drywall - 1/2" x 4'x8'    
Wall 53.88  
Ceiling 53.88  
Interior Wall 53.88  
Cement board around Shower 90.79  
Drywall Tape 4.40  
Texturing Material 12.97  
Gun 59.98  
Painting 95.91 1%
Primer - 350 sf/gallon 31.97  
Finish 63.94  
Finish Carpentry 22.76 0%
Baseboard Trim 22.76  
291.75 Linear Inches = 24.5'    
Lighting Fixtures 83.8 1%
Bathroom Bar Light (4 bulb) 15.98  
Bulbs 19.96  
Shower overhead 47.86  
Flooring - 65sf 319.35 4%
Tile 259.35  
Thinset 20.00  
Grout 20.00  
Sealer 20.00  
Finish Plumbing 831.13 10%
Shower Pan 229.00  
Toilet 75.00  
Toilet supply line 3.99  
Toilet supply line valve 10.00  
Undermount Sink 156.00  
Sink Faucet 92.00  
Shower controls 66.94  
Valve 77.18  
Shower head 54.98  
Diverter Valve 31.06  
Overhead shower head 34.98  
Countertops 73.41 1%
Concrete - 60"x20"x2" - 1.4 cubic feet 7.50  
Rebar - slab to stem wall - #4 12" OC, 12" leg in each part (2' each) - 25 total = 50' 22.41  
Rebar sheets - double overlap min overlap - 6"x6" 4mm - 42"x86" 43.50  
Cabinets 100 1%
Cabinet w/o Countertop 100.00  
Mechanical 96.12 1%
Exhaust fan 80.96  
Exhaust ducting - Rigid Duct 4" 5' legs 15.16  
Draft blocker 6.28  
External Vent 6.06  
Subtotal Direct Job Costs 6262.64 78%
Permits & Utilities 1000.00 12%
Plans & Specs 394.00 5%
Subtotal Indirect Job Costs 1394.00 22%
Total Cost 7656.64 100%
Per square foot - 75sf 102 $/sf
Avatar
K
Admin
Forum Posts: 31782
Member Since:
15 Feb ’12
sp_UserOfflineSmall Offline
35
30 Oct ’14 - 8:34 pm
sp_Permalink sp_Print

pdf file size should be fixed now

Forum Timezone: America/New_York

Most Users Ever Online: 698

Currently Online:
49 Guest(s)

Currently Browsing this Page:
2 Guest(s)

Top Posters:

easytapper: 2149

DangerDuke: 2030

groinkick: 1667

PorkChopsMmm: 1515

Gravel Road: 1455

Newest Members:

Forum Stats:

Groups: 1

Forums: 12

Topics: 11482

Posts: 58640

 

Member Stats:

Guest Posters: 2

Members: 19842

Moderators: 0

Admins: 1

Administrators: K