added the top and bottom plates to the windows
covered the centers
and added the sides, I like it
my daughter wanted as thin of a piece of molding as possible so I ripped down some 1x8's and stained them up
and covered the ceiling joints
almost done, need to do outlet covers and trim out around her small window, stain the stairs, trim those out and knock out the lower level
well knocked out the last window in the new part
we decided to use a smaller trim due to it's size
I started trimming out the stairwell
when I realized I needed some more pine, so I went and grabbed some and stained it all up and trimmed out the windows in the old section.
had some quick dinner and went back to finish the stairwell when I realized I needed a 1x10 not a 1x8, so now I wait for the lumberyard to open up.
6 Feb ’14
KVR said
that is the thousand dollar question, not sure to be honest. It will be interesting to see her reaction when she has to go to the bathroom in the middle of the night during a blizzard. Thinking about getting her a bed pan as a gag gift for x-mas.
I predict a composting toilet in your immediate future.
Most Users Ever Online: 698
Currently Online:
260 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Top Posters:
easytapper: 2149
DangerDuke: 2030
groinkick: 1667
PorkChopsMmm: 1515
Gravel Road: 1455
Newest Members:
Forum Stats:
Groups: 1
Forums: 12
Topics: 11482
Posts: 58640
Member Stats:
Guest Posters: 2
Members: 19842
Moderators: 0
Admins: 1
Administrators: K